Setting Up And Preparing For First Floor Works.
Next week, the electrician will be doing some work before more construction work can be continued. The building project is shaping up as per the project time line.
I have created a picture movie time line which shows, starting from the architects 3D drawing to the current state the project is at. Enjoy